TERGA Power Planet Project


الموقع: ALGERIA

نطاق العمل: Geotechnical investigation program

المدة : N/A – N/A

...

نظرة عامة على المشروع :

CiviTech contributed to the Terga Power Plant project by delivering a comprehensive suite of engineering services that supported both the structural integrity and operational efficiency of the facility. Our involvement began with detailed geotechnical investigations to evaluate subsurface conditions and inform safe, cost-effective foundation solutions tailored to the site's geological profile.

Following this, our engineering team carried out full structural analysis and design for the plant’s key facilities, ensuring compliance with performance, safety, and durability standards. This included the development of resilient structural systems capable of supporting the heavy mechanical and electrical loads associated with power generation infrastructure.

In parallel, we provided landscape design that integrated functionality with aesthetics, enhancing the site’s usability and visual coherence. Additionally, we designed a robust drainage system to effectively manage surface, minimizing the risk of flooding and ensuring environmental sustainability.

CiviTech’s multidisciplinary expertise ensured that all elements—from underground to above-ground—were designed to work in harmony, supporting the long-term performance of this vital energy infrastructure project.

الخدمات المقدمة:

* Geotechnical investigations. * Full structural analysis & design and * landscape work. * Drainage system design.
تواصل معنا؟

Address

8, Mokateli Ramadan Buildings-Hassan Maamoun St., Nasr City

Phone

(202) 24728706 – 24721070 - 01223224876

Email

civitechegypt@civitech-eng.com